40+ Days Ahead of Schedule

Transforming a Brand the "Rite" Way

The Challenge:

Rite Aid acquired a drugstore chain and needed to quickly and efficiently convert all stores into Rite Aids.

The Execution:

Premium assembled 21-member transition teams to remodel the stores. This included fixture installation, painting, assembly, resets and tagging.

The Results:

At 1,005 hours per store, Premium completed each store within 5 days and finished the entire project more than 40 days ahead of schedule. Premium exceeded expectations and achieved this through a flexible and creative training solution that enabled our reps to hit the ground running.

Pills
 

17,444,487 In-Store Activities Completed

Providing Trusted Service on Every Corner

The Challenge:

With such a large footprint, Walgreens needed a partner they could trust to perform a wide range of in-store services to ensure absolute consistency. These services ranged from POP placement to new item cut-ins, product rotation, IRC placement and much more.

The Execution:

Premium was chosen to service Walgreens locations, nationwide.

The Results:

In a single year, Premium completed 17,444,487 in-store activities for Walgreens, delivering on our promise of unparalleled consistency and scalability.

Bottles
 
 


 

Mass

 

Consumer Electronics

 

Drug

 

Food

 
 

Home

 

Office

 

Specialty

 

Toys